Sharon Creek Rehabilitation

The Sharon Creek Rehabilitation Project was a collaborative initiative between Mill Creek Alliance, Great Parks, Tri-State Trails, and MSDGC focused on protecting critical sewer infrastructure, enhancing wildlife habitat, and creating a corridor for future regional trail development. The project involved the realignment of Sharon Creek and an increase in stream capacity to improve flood conveyance and provide long-term benefits to surrounding residents and properties. Construction efforts included the installation of approximately 6,700 tons of rock for slope stabilization and erosion control, along with approximately 25,000 cubic yards of soil excavation.

Project Highlights

Project Details

Client: Mill Creek Alliance / Great Parks / MSDGC

Location: Sharon Creek, Greater Cincinnati Area

Category: Municipal & Public Works

Key Services: Stream Rehabilitation, Erosion Control, Earthwork, Environmental Restoration

Equipment Operators

Experienced equipment operators for excavators, dozers, skid steers, and compaction equipment. Must have a strong work ethic and be comfortable operating heavy machinery on commercial and municipal jobsites.

Truck Drivers

Dump truck drivers for material hauling during excavation and site development projects. Valid CDL required. Knowledge of civil construction site logistics and local roadways is preferred.

Join Our Crew